top of page
500 KWp Mukuzani Solar Power Plant

500 KWp Mukuzani Solar Power Plant

500 KWp Solar Power Plant participating in net metering program. Commissioned in September 2025. Located in Gurjaani Municipality, Kakheti Region of Georgia. 

  • Project Identity

    • Name: Mukuzani Solar Power Plant
    • Technology: Ground-mounted Solar PV
    • Status: Fully operational
    • Installed DC Capacity: 626 kWp
    • AC Capacity: 500 kWac
    • Inverters: 5 × Huawei string inverters
    • Number of PV Modules: 1,080 units

    Development & Regulatory Status

    • Grid Connection: Connected and operational with Energo-Pro Georgia through a dedicated 10 kV on-site substation
    • Land: 7,502 m² of privately owned land
    • Construction Permit: Fully issued
    • Environmental Permits: Not required under current national legislation
    • All Approvals: Completed; no pending obligations

    Technical Characteristics

    • Layout: Fixed-tilt mounting structure

    • Estimated Annual Generation: ~0.984 GWh/year

    • Specific Production: 1,570 kWh/kWp/year

    • Performance Ratio (PR): 87.81%

    • Infrastructure: On-site 10 kV substation, perimeter fencing, monitoring & SCADA system, and video surveillance system

    • Operational Performance: Stable long-term yield profile supported by consistent irradiation and modern hardware

    Commercial Highlights

    • Revenue Model: SPP Rent to retail customers under the Net Metering mechanism (Details can be aligned based on investor preference or buyer negotiation.)
    • Asset Type: Turnkey, cash-flow–generating, operational solar power plant
    • EPC and O&M: Can be extended/optimized upon request
    • Suitable For: Direct investors, ESG portfolios, utility-scale aggregators, and institutional buyers
bottom of page